Mine development studies
- 01Scoping study0–80
- 02Pre-feasibility study (PFS)80–375
- 03Feasibility study (FS)375–725
- Projects
- 14
- Tasks
- 69
- Milestones
- 3
- Checklist items
- 226
- Links
- 108
Build the schedule, track progress through dated approvals and give management the report in one step.
Start from a template or from scratch. Tasks are dated by the working calendar and linked; when a task slips, its successors move automatically.
As the status date moves on, actual progress is calculated from dated checklist approvals.
S-curve with plan, actual and forecast finish; a PDF progress report and an Excel workbook that updates itself when the status date changes.
A 73-second tour: the project hierarchy, the live schedule logic, approvals turning into progress and the board-ready report. Click a chapter to start the video there.
Seven levels in one hierarchy, with progress rolled up automatically.
Weighted checklist approvals with dates become task progress.
PDF progress report and Excel export from the same data.
Every level can be added, renamed, dragged and saved as a template. Weighted approved checklist items roll up into the task, tasks into the project, projects into the space.
Every date entered in the list updates the Gantt, every approval the dashboard, S-curve and report at once. The screens on the cards are taken from the program itself, with sample project data.
Administrator, project manager, editor, contributor, viewer; extra permissions per space and department; completion approval.
Work in the same workspace at the same time; changes reach everyone within seconds, work continues offline.
Ctrl+K searches spaces, projects, tasks, checklist items and notes; keyboard shortcuts.
Dependency violations, date order, duration vs calendar and unassigned tasks, line by line.
17 templates, 59 phases, with projects, tasks, milestones, weighted checklist items and links. Durations are working days, dated from your start and the space’s country calendar.
In the program: sidebar › Spaces › Create from template. Each phase can also be added to an existing space. Which template for which work: Use cases →
Every day of slip on a line without float moves the target by the same day. The program derives this from the links and the space’s country working calendar (weekends and public holidays included) and shows the remaining float on every task in working days.
FS · SS · FF with lag; link by dragging
per-space country catalogue and company holidays
formula-driven report; import back
every action is undoable; change log
Ready-made templates for mine development, open-pit start-up, process-plant EPCM, drilling and permitting. For Windows; works offline, with MPI Cloud for teams.
Windows 10 / 11 · 64-bit · version 1.2.4 · 123 MB
For licences, trials and onboarding your team, send us a message.